PROIGN MES
See machine states as they report and measure shift OEE with its coverage.
CNC machines report their status, alarms and part counts through a collector, operators explain stops and report output on the station terminal beside a machine, and supervisors review OEE by machine and by shift.
Available with Enterprise, subject to configuration.
Outcomes
- The floor at a glance: The Machine Dashboard counts running, online, alarm and offline CNC machines, shows fleet utilization and the machines' programs and parts, and refreshes while it is open.
- Stops explained at the machine: At the station terminal operators give reasons for stops and record scrap, and the unexplained stop time stays on the terminal for the shift.
- OEE that shows what it covers: Plant OEE is weighted by planned busy time, the figures say how many machines they cover, and a program without a planned run time is flagged instead of guessed.
How it works
- Watch the floor: The Machine Dashboard shows the CNC machines and work stations with their state, program and parts. Mill 02 is in alarm for low coolant.
- Report from the station: At the station beside Mill 01 the operator sees the job from the ERP work order and sends the counted good and scrap parts with Send to ERP.
- Find the bad actors: Alarms counts today's faults, interlocks and holds, shows the alarm still active on Mill 02, and ranks the most frequent alarms with their time, how many machines they hit and how often they chatter.
- Review OEE: Plant OEE is weighted by planned busy time and covers 5 of 6 machines here: program CS-PACK has no planned run time, so Pack Line 06 shows Needs PRI in the Machine Breakdown, and the notice above the gauges asks for one with Set planned run times.
In the product
- A station beside the machine: The operator sees the machine's state, the shift figures and the ERP job dispatched to it, then sends good and scrap counts to the work order operation.
- Alarms by class: Alarms are timed from activation to clear and classed as a fault, interlock or hold, with unclassified alarms counted as faults, beside the most frequent alarms and the ones that chatter.
- OEE by machine and by shift: Gauges for plant OEE, availability, effectiveness and quality say how many machines each figure covers, the Machine Breakdown shows the machines' times and ratios, and the Shifts report follows the day shift. A quality figure the shift has not settled is marked provisional.
Capabilities
- Machine status and connectivity
- Production reporting
- OEE and shift analysis
- Alarm monitoring
Where it runs
Works alongside
- ERP: Coordinate master data, planning, commercial operations and manufacturing records.
- Inventory: Understand stock across locations and investigate its movement.
- Analytics: Explore operational measurements and investigate changes.
Questions
Which machines can MES connect to?
Supported CNC machines report through a collector set up for your plant, and manual work stations report through the station screen beside them. Machine connections and shifts are configured during setup.
Does MES work with our ERP work orders?
With ERP, yes. Once a machine is placed in an ERP work center, its station shows the jobs dispatched there and sends good and scrap counts to the work order operation. A report the ERP has not confirmed is sent again, and a report the ERP refuses is listed for attention.
How are shifts and planned time defined?
Shifts and breaks come from the work calendar configured under Planning, and the OEE page says when no calendar is set.
Why does a machine show Needs PRI?
Effectiveness compares the planned run time of the parts with the time the machine produced. When a program has no planned run time, the machine's effectiveness and OEE stay unknown and the page asks for one under Planning.
Read the MES guide | Watch the guided demo | See the apps | Compare plans | Talk to us